Conservation / AlUla, Saudi Arabia
Unit 318
Reading a historic building through digital survey, material evidence and restoration design.
My contribution
I carried out existing-condition surveys using 3D scans, prepared technical drawings, developed restoration proposals and contributed to method statements.
I led the physical restoration works on site and was responsible for their execution, directly managing the builders and craftspeople. I also proposed, executed and supervised stabilization works, following the project drawings and method statements through completion.
Work undertaken with EQI KSA for the Royal Commission for AlUla.
3D survey views
Views from the existing-condition 3D survey.



Technical & working drawings
Survey documentation, restoration proposals and architectural working drawings.